Horst Engineering’s Solar PV Electric Power System Cranks Out the Watts

This past January, Horst Engineering marked the successful commissioning of a 39kW rooftop solar system. After six months, the system has been performing at a high level and has contributed to a dramatic reduction in the company’s greenhouse gas emissions. More than half of the electricity demand at the company’s renovated 41 Cedar St. plant is satisfied by solar power. Please see our latest press release for details about the system.

View the company’s online database that shows real time system performance. Make sure you return to this page in case the sun isn’t shining!

This entry was posted in Front Page, General News. Bookmark the permalink.